Sunday, 22 April 2012

Preparing for the Engineering Day



Objective: 

  • ·         To prepare final year project poster
  • ·         To prepare final year project pamphlet

Content/procedure:

  • ·         Built a FYP poster and pamphlet using Microsoft publisher
  • ·         The poster specification must follow the UniKL BMI FYP poster specification
  • ·         The poster specification must include the project objective, methodology, result and the rest is up to our creativity
  • ·         The poster are free design ad don’t have specific format
  • ·         The FYP pamphlet format are same as FYP poster

Result/analysis:

·         We have done to complete Our poster and pamphlet for FYP
·         We have complete all the task step by step and follow all the procedure

Conclusion:
For the week 14 task, we have done to the task by schedule. We have done to prepare the poster and pamphlet completely. And also we have ready to present our Final Year Project.



Combined All Part Of Solar Power Regulator

Objective:
  1. Install the combined circuit into the casing step by step
  2. To make the finishing process
Process:


  • ·         Make a hole into the casing by drill it for to place a push button, solar and circuit design
  •       Pair the stand to the casing
  •       Tide it and put the circuit to the stand and tide it again
  • ·         Install the combined circuit into the casing.
  • ·         After install the circuit label all the circuit correctly.
  • ·         Double check the combined part and tight it
 
Result/analysis:

·         We have managed to combine the combined circuit into casing
·         All the procedure have been done step by step.



Conclusion:
For this week 13, we have manage install the combined circuit into casing. We have combined it and arrange it properly. All process done and finis.

 Make Hole

Stand For Circuit

Circuit Done

Base For the Solar Panel

 Finishing