Week
2
Title
of activities: Project Planning and Cost Consideration
Objective:
·
To configure the project development
·
To get the costing of the project
·
To make the plan and time to finish the
·
Do the project planning using Microsoft
project (Gantt Chart)
Procedure:
1. Produce
the table that listing all the activities to be done for the project
2. List
all the component to purchased
·
Resistor 180 ohm, resistor 15M 0hm, resistor
100k ohm
·
Variable resistor 1M ohm
·
Capacitor 1 farad, capacitor 470 micro farad,
·
Transistor TIPP31C npn, zener diode 1 watt,
signal diode 1N4148, Transistor 2N3819
·
Solar panel 6v-12v 1mW
·
P.C.B board
3. Make
a survey the market price of the component
4. List
the component and make costing
5. Estimate
the duration of each task of the project
6. Key
in all the information from the table to ‘Microsoft Project’.
7. Save
the project planning and print out the ‘Gantt chart’
Result
and analysis:
·
Project planning is done with Gantt chart
·
Project planning is important to estimate the
time and cost to produce the project and details how the project will be
conducted stage by stage.
·
Internet survey is needed to make sure the
market price.
Conclusion:
The
conclusion from the project planning by using the ‘Microsoft Project”, we are
able to do the estimating for due time of the project and the cost to start the
solar project construct. This is important to us to manage the project regularly.
ok good start. Make sure you have project objectives and block diagram. At least boleh lead to the implementation of the project. Tx